July 31, 2024
Wind generator use slows to 5% per year
The executive director of the Mexican Wind Energy Association (AMDEE), Héctor Treviño, reported that the growth of installed wind energy capacity in...
Read more
July 31, 2024
Wind generator use slows to 5% per year
As of the latest AMDEE report, Mexico has 7,413 megawatts of wind power. This represents 8.6% of the country's installed capacity, distributed in...
Read more
July 31, 2024
AMDEE urges to unblock wind energy development
The Mexican Wind Energy Association, AMDEE, called for unblocking the development of wind energy in Mexico, reports Global Energy. See news
Read more
July 31, 2024
Wind power generators urge to remove brakes on the sector
Installed capacity growth slowed from 32% to 5% annually and there are almost 5,000 megawatts waiting to be connected to the grid, said Héctor Treviño,...
Read more
July 31, 2024
New wind in wind power generation: Windpower 2024
The most important congress and exhibition within the wind energy industry in Mexico announces its congress to be held at the Barceló Hotel in Mexico City on the 27th and...
Read more
July 31, 2024
The uncertain future of energy in Mexico
After the lag in the energy transition and administrations that preponderate the use of polluting energies, there could be a change in the...
Read more
July 31, 2024
Renewable Energy to Power 23% of Mexico by 2026
Capacity of large-scale solar photovoltaic and wind energy, as well as distributed generation, will account for 23% of the national capacity within the next...
Read more
July 31, 2024
2023 the best year in history for wind energy production
Mexico WindPower®, the gateway to the wind energy sector in Mexico, announces its congress to be held on August 27 and 28, 2024, at the Barceló Hotel...
Read more
July 31, 2024
Without changes in energy policy, solar and wind energy to reach 23 % share by 2026
Wind, large-scale solar and distributed generation solar will reach 20,691 MW in the next two years, Oliver Probst predicted. See...
Read more
July 31, 2024
Wind energy, with the 'headwind' in Mexico; $10,000 million dollars in investment detained
In spite of the lack of infrastructure, the current administration is holding up more than 30 projects to produce electricity from the use of wind energy....
Read more